FR Get started
Strategic Execution Intelligence

Predictive Intelligence for Every Industrial Investment Decision.

On industrial projects, delay is tracked in weeks, never priced. Everyone sees the slippage; no one puts a figure on what it destroys, in margin, in deferred savings, in risk drawing closer. SEI turns that time into money: before you commit the funds, it states what a week of delay would cost; once the project is running, it sees the drift coming and prices it as it forms.

SEI · Portfolio
DEMO
Cumulative exposure · cost of delay
5.37 M€
Projects at risk
3 / 34
Median execution score
50 / 100
Delay × execution score
Project A · Capacity extension
Growth
Cost of delay340 k€/wk
TrendDrifting
Execution score 72High risk
Resources
shared dedicated
 
Next fund-committing decision €2.4m · committee, 26 Nov

Demonstration · illustrative data from an anonymised portfolio · no client data

What we offer

One intelligence, at every point of the decision.

Diagnostic · the starting point

Understand where your projects lose value. ↗

The entry point of the whole approach. We analyse your projects file by file, down to the root cause, and this is what calibrates the model on your own industrial history.

See this step in detail →
Business case · before commitment

Appraise the value, and predict the risk. ↗

This is where the cost of one week is born, and it is not decreed: it is derived from how the case builds its value. Served capacity is lost week by week; a regulatory deadline costs nothing for months, then everything at once. SEI returns a range, never a single figure, with the assumptions used and what remains to be checked, and it recognises along the way the projects carrying the profile of those that drifted. That figure is then locked at commitment: it is what the cockpit keeps running, and what close-out settles.

See this step in detail →
Execution cockpit · during the project

Measure the consequence, foresee the drift. ↗

SEI reads what your systems already produce (ERP exports, schedules, minutes) and draws the priced consequence of every slippage. It replaces no tool; it plugs in the economic read-out, and flags the projects turning toward drift.

See this step in detail →
Pharmaceutical production reactor
Operator in a cleanroom
From data to decision

Predicting is pointless if nobody then decides.

Five steps, from the file you already produce to the measured effect of the decision. Each one is verifiable and traces back to its source.

Our technology

A model that learns from your industrial history, more accurate with every project.

Not the offers, but what runs underneath them. Four building blocks turn your projects into priced decisions, and make the whole thing hard to copy.

Who it is for

Who SEI is built for.

Industrial companies committing to long investments in regulated environments, where commissioning cannot be redone and where the promised value depends on a date.

You will recognise yourself if your committee weighs cases appraised under different assumptions. If your projects are rebaselined without anyone pricing the shift. If your estimating benchmarks live in three people's heads.

Industrial leadershipProject management and PMOIndustrial controllingInvestment sponsors
The company

One engine, three moments.

Trixelia builds SEI. One calculation, applied at three moments in the life of an industrial investment. Before committing, to state what the project is worth, what a week of delay would destroy, and what risk it carries. During execution, to price every slippage as meetings go by. At close-out, to settle the gap between what was promised and what was delivered.

These are not three products. It is what makes the promise hold: a cost of delay invented mid-project would be worth nothing. It has to be born in the investment case, locked at commitment, and settled at close-out.

One founder, three locations: London, Switzerland and France.

The reference portfolio the model is built on holds dozens of closed industrial projects, analysed case by case down to the root cause. It is anonymised: no company, site or individual is identifiable. That is the condition for yours to stay that way too.

Origin

The same discovery twice, both times too late.

A project delivered ninety-one weeks late. Reporting green all the way to commissioning. And at close-out, nobody around the table able to say what that delay had cost.

Going back through the closed cases one by one, the second discovery was more troubling than the first. Those projects had not only been badly executed: they had been badly appraised. Approved under conventions that changed from one case to the next, on estimates the site's own history already contradicted. A project approved below the benchmark for its nature ends up drifting all the way to that benchmark. It did not slip; it had been underestimated.

The same factors, read at the same milestones, produced the same drift. What looked like a run of bad surprises was a pattern, and a pattern can be modelled.

Trixelia came from there. Not from a hunch about artificial intelligence, from a finding in a set of files.

Behind Trixelia
Annabelle Frisa, founder and CEO of Trixelia

Founder and CEO

Annabelle Frisa

Over fifteen years in regulated industries, running capital projects where a mistake cannot be undone in production.

I spent fifteen years running industrial projects in environments where every decision is documented, justified and controlled. Everything there is measured: budget variances, non-conformities, qualification lead times. One thing is never priced, and it is the one that costs the most. Time.

A budget overrun has an owner. It has its line, its variance, its item on the agenda. A delay has none. You rebaseline, and it disappears. I have watched projects stay green all the way to commissioning and destroy millions in value without a single indicator lighting up.

And when I went back through the files, I found worse than delays. I found projects approved under assumptions that changed from one case to the next: a contingency rate running from zero to twelve per cent, a residual value assumed anywhere between zero and eighty. A committee that thinks it is choosing between two projects is often choosing between two sets of assumptions.

I built SEI because that information already exists. It is in the investment case, it is in the schedules, it is in the meeting minutes. Nobody had connected them.

What I want is that no industrial investment decision is ever made again without its cost having been priced.

Engineers reviewing an industrial project

Building the intelligence layer for industrial decisions.

Industrial investment decisions have never had a real intelligence behind them. We're building it: a model that turns projects into priced, defensible decisions.

We're looking for people who want to work on hard problems that matter, and shape how an entire industry decides. If that's the kind of work you're after, let's talk.

Build with us →
Request a demo → Contact us →